Installation of new CCGT-400 at Yaivinskaya TPP, OGK-4, Perm area, Russia

The installed electrical capacity of Yayvinskaya TPP is 600 MW and the heat capacity is 69 Gcal/h. The TPP produced 7.5% of all energy generated by OGK-4 in 2008. The CCGT unit, with the electrical capacity of 400 MW, will be installed and commissioned at the end of 2011. The gross efficiency of the new energy unit will be capable of reaching up to 58%.

Project owner: OJSC “OGK-4” (now – OJSC “E-on Russia”)

Location: Yaiva, Perm region

PDD Reduction Volume: 924 364 tons CO2eq.

Track: 1

Project Status: Seeking host country approval