The installation of two CCGT-400’s at Surgutskaya TPP-2, OGK-4, Tyumen area, Russia

Surgutskaya TPP-2 is the largest power plant operated by OJSC “OGK-4” and the largest power plant in Russia. The installed electrical capacity is 5,600 MW and the heat capacity is 840 Gcal/h. Two CCGT units, with a total electricity capacity of 800 MW, were installed and commissioned in mid-year 2011. The gross efficiency of each new unit is around 56%. Dry associated gas is used as the fuel.

Project owner: OJSC “OGK-4” (now – OJSC “E-on Russia”)

Location: Surgut, Tyumen region

PDD Reduction Volume: 2 344 040 tons CO2eq.

Track: 1

Project Status: In the host country approval/first pre-monitoring stage