The project proposes to utilize excess coke oven gas (COG) to generate electricity by two new turbines (one backpressure and one condensing) replacing power currently being sourced from the national grid. This is introduced in parallel with improved automated process control systems that will increase the efficiency in power usage, while further reducing national grid power requirements. The turbines will be installed at site of ZaporozhCox in the new turbine workshop. All necessary equipment and commissioning, including the automation systems, are included in the project activity. The project also includes the modernization of the power-supply system.
Project owner: “ZaporozhCox Plant”
Location: City of Zaporizhya
PDD Reduction Volume: 257 251 tons CO2eq.
Track: 2
Project Status: Second issuance done
Link to JISC website if it is already registered:
http://ji.unfccc.int/JIITLProject/DB/RYIEF11QTZR4OSZRUBHB107G0A1FBX/details
Information on issuance: Second issuance on 9 August 2011, total accumulated volume ERUs issued: 146 181.