This JI project takes place at the CJSC Mini Steel Mill ISTIL in
ISTIL is a modern mini steel mill in Ukraine, operating electric arc furnace, continuous casting machine and blooming mill. The company produces quality steel products, such as rolled and cast billets and special quality bars that are sold to rolling mills, seamless pipe manufacturers, engineering plants and distributors worldwide.
The main goal of this JI project is to reduce energy consumption at the ISTIL plant and environmental pollution from the plant situated in the centre of Donetsk city. The project envisages three interventions to the production scheme of ISTIL:
![]() |
2) New steam generator;
3) Soaking pits control system.
Emission Reductions
A total of 207,763 tonnes CO2 will be reduced until the year 2012.
JI Project status
The Project Design Document of ISTIL JI project was published at the JI UNFCCC website here.


